Snapethorpe Primary Floor Restoration
Parquet Floor Restoration done at Snapethorpe Primary in Wakefield. Floor was sanded down to a fgine grit and was finished with 4 coates of Junckers HP lacquer
Parquet Floor Restoration done at Snapethorpe Primary in Wakefield. Floor was sanded down to a fgine grit and was finished with 4 coates of Junckers HP lacquer
Hull University stairs restoration done by casing extended stairs with oak engineered planks. Also a small area of the corridor has been laid with parquet blocks. Once installed entire corridor at Larkin Building was sanded and 4 coates of high traffic lacquer was applied
Burberry Factory Floor Restoration has taken place in several stages. 3500 sqm of maple floor sanded and finished with 4 coates of lacquer.
Tom Foolery Pub Boston Spa, a section around bar area has been affected by roof water leak and poped up, we had to lift damaged area up, level the base with self levelling compound, after it dried we supplied matching solid oak strip installed it and entire pub has been sanded and completed with 4 coates of Junckers Hp Commercial
The Browns Pub floor restoration was done thru the night with minimum disruption. The floor was sanded down and 4 coates of Junckers HP lacquer were applied
Solid beech strip, sanded and completed with 4 coates of lacquer at Northfield Primary School Pontefract